Interior Fit-Out · [Area, Dubai — e.g. Business Bay, Dubai]

Jack & Jones

[One sentence summary shown on project cards — what was done, where, and the headline result. Example: “Bare shell to opening day in 5 weeks — fit-out, MEP, and signage for a Marina retail unit.”]

Service Interior Fit-Out
Location [Area, Dubai — e.g. Business Bay, Dubai]
Timeline [e.g. 5 weeks]
Scope [e.g. Fit-out, MEP, joinery, signage]
Client [e.g. Villa Owner / F&B Operator / Retail Brand]
Status [e.g. Completed 2026]

Jack & Jones :

  • Service tag: Interior Fit-Out / Joinery & Carpentry / MEP Works
  • Location: BurJuman Mall, Dubai
  • Timeline: 6–8 Weeks
  • Scope: Full fit-out from shell & core to complete fixture & display installation
  • Client: Jack & Jones
  • Status: In Progress

The Brief

Jack & Jones appointed us directly to take their new BurJuman Mall unit from a bare shell to a fully trading store. The scope ran from the ground up — all civil, MEP, and finishing works through to the final fixture and display installation. One contractor, one programme, one opening date to hit.

Challenges     

Mall fit-outs operate within a strict authority framework — BurJuman’s fit-out regulations, submission timelines, and inspection requirements all have to be managed in parallel with on-site execution, and any gap between the two stalls the programme. Working within a live mall environment meant deliveries, noisy works, and waste removal all had to be scheduled around mall operating hours and coordinated with mall management. Aligning the fit-out scope precisely with Jack & Jones’ international brand standards while adapting to the specific dimensions and constraints of the BurJuman unit required close coordination with the brand’s design team throughout.

Our Approach

A retail fit-out in a live mall environment means two things matter above everything else: mall authority approvals and the opening date. We started by aligning the full programme with BurJuman’s fit-out regulations and submission requirements, so nothing on site moved faster than the approvals could keep up with. Trades were sequenced tightly — structural and MEP first, then finishes, then fixtures — with fabrication running in parallel off-site so installation could begin the moment the space was ready. Every stage was tracked against the opening milestone, not just the previous task.

What We Delivered

  • Full shell & core fit-out — flooring, ceiling, partitions, and wall finishes
  • MEP works throughout — electrical, lighting, AC, and plumbing to mall spec
  • Joinery and carpentry built to Jack & Jones brand standards
  • Complete fixture and display unit installation
  • Mall authority submissions and fit-out compliance managed end to end
  • On-site supervision throughout with daily progress reporting to the client

The Final Outcome

Project currently in execution — on programme and on track for handover within the agreed window.

Timeline

01 — Understanding the Requirement
Full brief received from Jack & Jones — brand fit-out guidelines, fixture schedule, MEP requirements, and the non-negotiable opening date mapped from day one.

02 — Site Visit & Technical Study
Shell & core unit surveyed in full — slab to slab height, existing MEP stub-ins, mall demise boundaries, and structural constraints all documented before scope was finalised.

03 — Planning & Scope Finalization
Complete fit-out scope agreed and approved — civil, MEP, finishes, joinery, and fixture installation all itemised with a programme built backwards from the opening date. Mall fit-out submission package prepared.

04 — Material & Execution Schedule
Long-lead MEP materials and joinery put into order immediately. Fixture fabrication coordinated with the brand. Mall NOC and fit-out permit tracked in parallel so on-site works could begin without delay.

05 — On-Site Execution
Shell & core works commenced — partitions, ceiling, flooring, and MEP first fix. Finishes applied trade by trade as each zone was cleared. Joinery and built-in elements installed. Fixture and display units brought in and positioned to the brand’s VM layout.

06 — Quality Check
All finishes, MEP installations, joinery fit, and fixture alignment inspected against the approved brand fit-out guide and mall handover checklist. Snags closed before the client walkthrough.

07 — Final Handover
Full store cleaned down, brand walkthrough completed, and unit handed over to Jack & Jones ready for merchandising and opening — on the date it was promised.

The Execution Journey

From idea to execution journey.

01

Understanding the Vision

We listen first — the client’s goals, brand, daily operations, and the deadline that matters.

02

Site Visit & Technical Study

Exact measurements, existing conditions, MEP capacity, and building requirements — documented before planning.

03

Planning & Scope Finalization

Layout, materials, and an itemised scope the client approves — with a programme built backwards from the deadline.

04

Material & Execution Schedule

Long-lead items ordered first, samples approved in hand, trades sequenced so no one waits on anyone.

05

On-Site Execution

One project manager, daily supervision, photo updates, and concealed works recorded before closing.

06

Quality Check

Every line, level, and finish inspected against the approved scope — snags fixed before you ever see them.

07

Final Handover

Deep cleaning, a walkthrough together, and a finished space delivered on the date promised.

★★★★★

“[Optional client quote — leave empty to hide the feedback section]”

[e.g. Restaurant Owner, Business Bay]